Operational Intelligence Platform — Construction

Govern every project from a single operating picture.

BuildTrack unifies field data, schedules, costs, and approvals into one auditable system of record — so every decision is traceable, every dataset is governed, and every project is visible in real time.

Operations ConsoleLIVE

Active Entities

  • PRJ-2291Meridian TowerOn Track
  • PRJ-1187Harbor DistrictSchedule Risk
  • PRJ-3340Atlas Logistics HubOn Track
  • PRJ-2864Northgate HospitalCost Variance

Data Pipelines

  • Field Reports → Schedule82%
  • Cost Ledger Sync64%
  • Drawing Revisions → RFI41%

Pending Model Approvals

  • APR-0042 Change order CO-118 — Harbor District
    94%
  • APR-0043 Schedule re-forecast — Meridian Tower
    88%

Audit Log

  • 09:42:11M.OKAFORAPPROVED CO-118
  • 09:38:54SYSTEMSYNC: COST LEDGER
  • 09:31:02T.RIVERAGRANTED ROLE: PM
  • 09:24:47SYSTEMALERT: SCHEDULE RISK PRJ-1187
Scroll to Explore
Network

Every active project, modeled as a single connected system.

Drag to inspect the graph. Each node is a live project; each edge is a governed data dependency — schedules, costs, and approvals propagating across the network in real time.

Live Network Graph
8 NODES / 10 EDGES
DRAG TO ORBIT
Operational Maturity Scale

Every organization sits somewhere on the scale. Most don’t know where.

Borrowed from a framework for classifying civilizations by the energy they can harness — applied here to how much of a construction program actually runs itself.

Maturity Index
TYPE I — IV
DRAG TO ORBIT
I

Manual Operations

Field data lives on paper and in spreadsheets. Status is whatever was reported last — and last week's numbers are the most recent truth available.

II

Connected Operations

Point tools for scheduling, cost, and field reporting — each accurate on its own, none of them talking to each other. Reconciliation is a full-time job.

TODAYIII

Unified Operations

Field data, schedules, costs, and approvals resolve to one governed system of record. Every project, every entity, one current state.

TARGETIV

Autonomous Operations

The system flags risk before it becomes a delay, recommends a course of action, and routes it for approval — humans decide, the platform executes.

1,400+

Active Projects Tracked

99.97%

Platform Uptime

<200ms

Field-to-Ledger Sync

SOC 2

Type II Certified

Platform

One system of record for the full lifecycle of a project.

01

Integrate

Connect field reports, drawings, schedules, cost systems, and subcontractor data into a single ontology — no manual re-entry, no shadow spreadsheets.

02

Orchestrate

Route RFIs, change orders, and approvals through configurable workflows that mirror how your organization actually makes decisions.

03

Audit

Every record carries a timestamp, an actor, and a confidence score. Reconstruct the full history of any decision, on demand.

04

Govern

Role-based access, data residency controls, and deployment policies that satisfy enterprise and government procurement requirements.

Reason over field reports, drawings, and schedules to surface the right action — from the job site to the back office.

/0.1

“...cross-reference source documents and field logs to identify the most likely root cause.”

ƒx Running Function: Pull Field Reports

Retrieving daily logs, RFIs, and inspection records for Harbor District to determine the right course of action.

⊙ Output: Recommended Action

Likely cause is a delayed material delivery. Confirm by checking procurement log against the updated schedule.

⚲ Searching Schedule Conflicts

Checking downstream tasks affected by the delay and flagging impacted crews.

Thinking about the next step...

FIELD

Coordinate every trade and milestone across every active project, from mobilization to closeout.

/0.2

Schedule Coordination Live
  • PRJ-2291Meridian Tower — MobilizationOn Track
  • PRJ-1187Harbor District — SubstructureAt Risk
  • PRJ-3340Atlas Logistics — CloseoutOn Track
  • PRJ-2864Northgate Hospital — MEP Rough-InWatch
AXIS

Track, reconcile, and forecast cost and schedule impact for every change order — with a full approval trail.

/0.3

Change Order CO-118v4.2

This change order has passed all approval stages.

Drafted

1 entity

Reviewed

1 entity

Approved

5 entities

COST IMPACT: +$48,200

SCHEDULE IMPACT: +3 DAYS

APPROVED BY: M.OKAFOR

LEDGER
Interface

A single console for the entities and workflows that run your program.

Ontology Graph

PROJECT
SCHEDULE
COST LEDGER
FIELD REPORT
CHANGE ORDER
RFI

Workflow Queue

4 Active
IDDescriptionStateElapsed
WF-8821RFI-204 routed to StructuralActive00:04:12
WF-8819CO-118 awaiting cost approvalPending00:41:55
WF-8814Daily field report — Atlas HubComplete02:10:03
WF-8810Schedule re-forecast — MeridianActive03:22:47
Governance

Built for organizations that cannot afford an ungoverned system.

01

Access Control

Role-based permissions enforced at the field, document, and project level — every grant and revocation is logged.

02

Audit Trail

Immutable record of every change, approval, and data sync. Exportable for compliance review and dispute resolution.

03

Deployment Controls

Cloud, on-premises, or air-gapped deployment with configurable data residency to meet procurement and regulatory requirements.

Permission Matrix

5 ROLES
  • Owner / ExecutiveFull visibility, read-only
  • Program ManagerCross-project approvals
  • Project ManagerProject-scoped read/write
  • Field SupervisorField data entry only
  • SubcontractorScoped task & RFI access

Deployment Targets

CloudOn-PremisesAir-GappedHybrid

Engagements

Bring one operating picture to your next program.

Speak with our team about deployment, data governance, and integration with your existing systems of record.